Environment · Health · Safety Consulting

We diagnose environmental risk
and protect asset value

Dime Works is an EHS consulting firm specializing in environmental and technical due diligence for facilities and assets — assessing ESG and sustainability risks to maximize and protect asset value across the entire investment lifecycle.

19+ yrsEHS experience
6service lines
2020–2026continuous track record
01 · About

Specialized EHS
Consulting

Dime Works performs environmental and technical due diligence on facilities and assets. We provide the information our clients need for decision-making and negotiation, and assess environmental, social, and governance (ESG) and sustainability risks to maximize and protect asset value throughout the investment lifecycle.

As the Korean partner of global EHS consultancies (ERM · Ramboll · CBRE) and a direct advisor to major Korean corporations and investors, we deliver due diligence services to consistent international standards.

"We diagnose environmental risk with precision — and propose practical alternatives to reduce it."
Company
Dime Works Co., Ltd.
CEO
Jaewon Min (Senior Consultant)
Location
#803, 99 Seongsuil-ro, Seongdong-gu, Seoul, Korea
Expertise
Environmental & Technical DD, EHS Audits, Contaminated Site Management
Standards
ASTM E1527 · IFC PS · Equator Principles
Key Clients
ERM · Turner & Townsend · CBRE ·
Coca-Cola · Ramboll · Lee & Ko ·
Samcheok Blue Power
Start Here

What brings you here?

Start from your situation — we'll point you to the right service.

02 · Services

Service Areas

From due diligence to remediation and monitoring — one team covers the full EHS spectrum.

01

Environmental Due Diligence

Integrated analysis of internal and external contamination sources, waste, and other environmental factors to assess potential risk. (Phase I ESA, based on ASTM E1527)

02

Technical Due Diligence

Pre-acquisition and pre-investment assessment of the technical value and CAPEX/OPEX feasibility of environmental facilities such as landfills and incinerators.

03

EHS Compliance Audit

Workplace hazard assessment, incident investigation, regulatory compliance review, and practical risk-reduction alternatives.

04

Contaminated Site Management

Phase I & II environmental site assessments, soil and groundwater remediation design, and on-site management and monitoring.

05

Construction Site EHS

Environment, health, and safety management for construction and demolition of facilities handling hazardous materials, including asbestos and waste.

06

ESDD/ESG · Permits

ESDD/ESG reviews based on the Equator Principles and IFC Performance Standards, environmental permitting services, and air, water, and noise monitoring.

03 · Methodology

How We Work

Every due diligence and audit engagement follows a consistent three-phase process, with each phase's deliverables forming the basis for the next.

01

Document Review

  • Data collection & review / site and facility history
  • Environmental permits & satellite imagery review
  • Analysis of chemical and petroleum handling history
02

Site Survey

  • Soil & groundwater contamination screening
  • Adequacy review of pollution control facilities
  • Asbestos, PCB & hazardous materials / staff interviews
03

Reporting

  • Quantitative risk analysis and rating
  • Recommendations for further investigation or remediation
  • Cost estimation and practical alternatives
04 · Track Record

Selected Track Record 2020–2026

Environmental DD (EDD)

  • Yongin site EDD 2026
  • IFC Seoul (Yeouido) EDD 2022
  • COEX Aquarium EDD 2021
  • NEPA Logistics Center (Anseong) EDD 2021

Technical DD

  • Ecorbit — 6 landfill sites, technical DD 2024
  • Coca-Cola Korea site technical DD 2024–25
  • Busan Green Power landfill technical DD 2025
  • Seokpo-ri landfill (Hwaseong) technical DD 2025

EHS Audit

  • 3M Hwaseong & Naju environmental audit 2026
  • BorgWarner Chungju & Eumseong EHS audit 2025
  • Birla Carbon Yeosu EHS audit 2025
  • Pfizer EHS audits 2018–21

Contaminated Site Management

  • Ulsan & Cheongju soil/groundwater investigation 2026
  • Renew Energy soil remediation 2026
  • Renault Busan soil investigation 2025
  • Hwasong Industry, Jeju — detailed investigation & remediation 2023

Construction Site EHS

  • Janssen Korea Hwaseong plant demolition EHS 2021
  • Garrett Korea Sihwa R&D center EHS 2019

E&S Monitoring (ESDD/ESG)

  • Samcheok Blue Power ESDD/ESG DD 2022–25
  • Coca-Cola Korea SVA (Source Vulnerability Assessment) 2025
  • Coca-Cola Korea site DD 2024–26
  • Bupyeong Data Center E&S DD 2022
  • Busan Data Center ESG DD 2025
  • Yangju Logistics Center ESG DD 2023
05 · Selected Engagements

Flagship Projects

2024–2026

Coca-Cola Plant Relocation

E&S assessment · SVA · Soil/groundwater investigation

Integrated EHS management for a global manufacturer's new site.

Read the case

Challenge — A global beverage manufacturer needed a complete picture of environmental risk while meeting corporate standards during new-site selection.

Approach — We performed the E&S assessment and soil/groundwater investigation for the new site, and conducted SVA (Source Vulnerability Assessments) for both the new site and the currently operating plant (2025).

Result — Three consecutive years of engagement — one team carrying the work from due diligence through water resource assessment.

2022–2025

Samcheok Blue Power Coal-Fired Plant

Environmental & Social Monitoring (ESDD / ESG)

Four consecutive years, based on the Equator Principles and IFC Performance Standards.

Read the case

Challenge — A major power project requiring independent annual verification of Equator Principles and IFC Performance Standards compliance as a condition of international financing.

Approach — Annual audits of the E&S management system, grievance handling, and environmental data, with reporting to the lender group.

Result — Four consecutive years of engagement — sustained appointment for international-standard monitoring is itself the proof of trust.

2020–2026

Landfill Technical DD Portfolio

Ecorbit · TSK · EMC · Koentec · SK ecoplant

One of Korea's most extensive track records in waste landfill and incineration facility due diligence.

Read the case

Challenge — Landfill acquisitions between investors are frequent in Korea, where the waste landfill business is drawing attention as a highly profitable sector — making rigorous pre-acquisition technical verification essential.

Approach — Site-based technical due diligence assessing remaining airspace, liner and leachate treatment systems, and CAPEX/OPEX feasibility.

Result — One of Korea's most extensive landfill DD portfolios (Ecorbit · TSK · EMC · Koentec · SK ecoplant), helping clients reduce technical risk and invest with confidence.

MAJOR CLIENTS

ERMRambollCBREJ&JCoca-ColaSamcheok Blue PowerEcorbitBorgWarnerRenaultGMSKLG Energy Solution3MPfizerTurner & Townsend
06 · Leadership

Leadership

JM

Jaewon Min

CEO · Senior Consultant
  • B.S. Civil & Environmental Engineering, Hanyang University
  • 19+ years in Environment, Health & Safety
  • Beautiful Environment Construction · SGS Korea · Enviro Partners
  • ISO 14001 & OHSAS 18001 Internal Auditor

KEY ENGAGEMENTS

Hands-on leadership across environmental and technical due diligence, EHS audits, contaminated site management, and E&S monitoring — with international-standard capabilities built through direct delivery of projects for global consultancies and major Korean corporations.

  • Coca-Cola Korea site environmental monitoring (2024–2026)
  • Coca-Cola Korea SVA — Source Vulnerability Assessment (2025)
  • Samcheok Blue Power E&S monitoring (2024–2026)
  • Busan Green Power landfill technical & environmental DD (2025)
  • Coca-Cola Korea site technical & environmental DD (2025)
  • BorgWarner Korea EHS audits (2024–2025)
  • Bupyeong Data Center E&S monitoring (2022)
  • IFC Seoul (Yeouido) environmental DD (2022)
  • TSK · EMC · Koentec landfill technical DD (2020)
  • Janssen Korea Hwaseong plant demolition EHS (2021)
  • Pfizer EHS audits (2018–2021)
Newsletter

EHS Insights Newsletter

Regulatory updates, due diligence case studies, and ESG issues — delivered to your inbox.

Contact

Start a Conversation

We advise on the full EHS spectrum — due diligence, audits, and contaminated site management.

📍

Address

#803, 99 Seongsuil-ro, Seongdong-gu,
Seoul, Republic of Korea

Your message will be delivered directly to the Dime Works inbox.